
Add to Cart
Two Direction Alloy Steel Guide Screw Precision Hot Forging ,CNC Machining Part
The Product Description
Outline Dimension | length | Diameter | Remark |
178 | 40 | 2 Directionlead screw | |
Weight(kg) | 0.63 | ||
Raw material | Hot Forging | ||
Major Process | forging+ CNC machining +package+shipment | ||
Surface Treatment | heat treatment | ||
Usage | Driving System | ||
Package | carton +wooden cage | ||
related industry | machine | ||
Quality Control | IQC PQC OQC |
Real Photos
Roughly Parameters
Product Specification & Other information List: | |||
1 | Item Name | Custom Forging Parts | |
2 | Size | As per approval product drawings. | |
3 | DRW Format | DWG, PDF, IGS, STEP, SLDPRT, SLDDRW, PRT, DRW, DXF, X_T, etc... | |
4 | Weight | 0.1-200 kg | |
5 | Material | Differenty types of Steels, Carbon Steel, Stainless Steel, Alloy Steel etc; Aluminum alloy, copper alloy, titanium alloy, tungsten molybdenum alloy and other non-ferrous metals. | |
6 | Application | Industry Equipments, Autos, Construction machinery Parts, Agricultural machinery, Railway relevant Parts, Petrochemical machinery, Mining machinery, The power industry. | |
7 | Surface Treatment | Self color, Polishing, Painting, Powder Coating, Electrophoretic Coating, Anodizing, Nickel Plating, Zinc Plating, Hot DIP Galvanizing etc. | |
8 | Quality Control | 1. IQC , PQC, OQC | |
2.100% check before shipment | |||
9 | Packing | Plastic bags, Cartons, Racks, Plywood Cases etc. accordingly | |
10 | Logistics | Shipping, Air Flight, International Express etc. | |
11 | Process | Die Forging, Free Forging, Hot forging, Cold forging, Heat Treatment, Machining, Surface Treatment etc. | |
12 | Certificate | ISO/9001 ISO/IATF16949 | |
13 | Service | Custom OEM/ODM metal parts processing, Whole Product assembly, 2D & 3D drawings design, International Delivery Logistics, Serivce before & after sales etc. |
Related Products
FAQ
1. What proportion of your goods are exported?
100% of our production are exported to all over the world.
2. How long does it take to receive samples?
a) Pattern:30-45days after order
b) Sample:30days after pattern finishing.
c) The lead time is the general production period and not include the transportation time.
3. New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. to confirm the developing schedule---Prepare Prototype and sending for confirmation, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the tooling sample with initial inspection report.
4. How long is the manufacturing lead time?
Mass Production: 50days after sample approval by yours.
The lead time is the general production period not including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.
5. What basis can we buy goods?
We generally offer customers prices FOB& CIF (Carriage, Insurance & Freight). The CIF includes the freight cost to your nominated sea port.
We do provide clearance of goods which needs to be handled by a local freight forwarder.
All local costs and taxes are the responsibility of the buyer. We are happy to offer advisement on shipping if required.